Walls, floors, niches, curbs and benches. Waterproofing included on every shower. From $30 per square foot of wall, labour.
Every quote lists these items separately. Nothing is added later.
| Item | Labour |
|---|---|
| Substrate check & levelling map | included |
| Full-system waterproofing + photo report | included |
| Flood test before tile | included |
| Wall tile, 2 mm joints, laser layout | $30–38 /sq ft |
| Floor tile, incl. shower floor slope | $12–18 /sq ft |
| Shower niche, built to size | $450–650 each |
| Trim-free (mitred) edges on curbs and benches | $60–80 /lf |
| Heated floor system | +$8–15 /sq ft |
| Grout, silicone at corners, final clean | included |
A shower fails behind the tile, years later. We photograph every membrane and sealed corner and send it to you before the first tile goes on.
Niche and curb edges are cut at 45° and finished by hand, so there is no plastic or metal strip. Trim is available if you prefer it.
We level first, then set tile flat and check it with a straightedge on the walk-through.
Tile work takes 3–5 working days after the membrane has cured. We schedule around your plumber and glass installer, so the whole room is usually back in 2–3 weeks.
Yes — that’s our preferred way to work. Send elevations and tile schedules; the quote calls out every detail.
Yes. It adds a floor recess and a linear drain, quoted as its own line so you see exactly what it costs.
10% to book your dates. The rest is paid by stage: after waterproofing, after tiling, after the walk-through.
Fixed, itemised quote within 48 hours
You talk to the installer, not a sales desk
Tile from any showroom — or at trade pricing through us
10% deposit, then pay by stage
We use your details only to prepare your quote.